# Actions diary and planner

> Plan work in your free time, keep deadlines separate, and see what needs to change when work cannot fit.

The Actions diary shows when you mean to do an Action, alongside its deadline. The planner fits estimated work into your free working time; you can also place your own plan by hand.

> [!NOTE]
>
> Everyone with a Platform seat can plan their own Actions; access to other people’s work still follows your permissions.

## Read the diary

Open an Actions **Calendar** and use **Due** as its date. **Calendar** in the sidebar opens the same calendar of your Actions and your connected calendar. Choose **Month**, **Week** or **Day** at the top.

**Week** and **Day** are a time grid. Each row is a slot, half an hour by default; the choice beside **Month**, **Week** and **Day** sets 15, 30 or 60 minutes and is kept for you. The hours are on the left, and a blue line marks the time now: solid with a dot on today, dotted across the other days. Time outside your working hours is shaded, and the grid opens an hour before your working day starts. Work that overlaps sits side by side, and a busy slot shows three items and then **+N more**.

An Action with a plan sits in the grid at its planned time and is as tall as the plan is long. An Action with no plan sits on its due day. A plan of a day or more runs along the **All day** row as one bar. In **Month**, a plan crossing days says **From** on its first day and **Until** on its last.

Meetings from a connected calendar, such as Outlook, appear where they fall. They are read only: you cannot move or stretch them here, they open in Outlook, and hovering one says so.

The Action’s **Timeline** is its agreed start and due window. A plan uses time within that window. Moving or stretching a plan does not move the deadline. A Calendar using another date field changes that field when you move a card, by days only.

## Place work on a day

**1. Estimate the work**

Open the Action and set its **Estimate**. Saphion needs to know how much time the work needs before it can fit it into your diary.

**2. Move its card**

In **Week** or **Day**, drag the Action to the slot where you want to start. Drop it on the **All day** row, or on a day in **Month**, and Saphion asks for that day’s first free time that can hold the work, within its agreed dates and after the work it waits on.

**3. Stretch it if the time is wrong**

Drag the bottom edge of the card to make the plan longer or shorter. The plan and the Action’s **Estimate** change together, with one **Undo**.

**4. Read the result**

The card shows its planned time. The confirmation offers **Undo**. If that time is not suitable, or the Action is not yours to plan, Saphion says why and the card goes back where it was.

## Understand the planner

Your working hours and connected calendar determine the time available. Busy time and plans you placed by hand are taken first. The planner fits the rest without overlapping plans, starting with the work that has least room before its due date and respecting the work it waits on.

| What the planner finds | What it means |
| - | - |
| **Not estimated** | The Action needs an Estimate before it can be fitted. |
| **Cannot fit** | There is not enough suitable free time before Due for the Estimate. |
| No due date | There is no deadline to plan towards. |
| Past due | The deadline has already passed; review it rather than treating the plan as current. |

A plan is a proposal for your time, not a promise that the work will finish. A plan you place by hand stays where you put it when the planner runs.

## Respond when plans change

A change elsewhere can delay work you are waiting on or make your work miss its due date. Saphion tells the affected person about their own Action. When the planner moves your plans because of someone else’s change, its notice offers **Undo**. A notice for work that cannot fit says what it needs and how much free time there is, so you can review the deadline, estimate or other commitments.

Open **Inbox** to find the notice later. A re-plan’s row menu can offer the same **Undo** as its pop-up. Taking back a re-plan does not undo the change another person made.

## How it works

* Plans belong to the same Actions you see in a Project and My actions. There is no second task list.
* The diary uses the Organisation’s time zone.
* Your permissions still govern changing dates, assigning work and opening records. Planning time does not grant those powers.
* Before a change to Start or Due that delays other work, the date editor can show what it would affect. Moving a plan and moving a deadline are separate acts.

## FAQ

> [accordion] Why is my Action still on its due day?
>
> An Action with no plan is shown on Due. Check its Estimate, dates and the time available.

> [accordion] Does dragging the card move the deadline?
>
> In an Actions Calendar using Due, it moves the plan and leaves Due alone. A Calendar bound to another date field changes that field, by days only.

> [accordion] Can I move a meeting from Outlook?
>
> No. Meetings from a connected calendar are read only in Saphion, so change them in Outlook.

## Related

* [Actions](https://docs.saphion.co.uk/work/actions.md): Dates, estimates, assignments and completion.
* [Boards, tables and views](https://docs.saphion.co.uk/work/boards-and-views.md): Calendar views and their date fields.
* [Inbox and notifications](https://docs.saphion.co.uk/work/inbox-and-notifications.md): Find and handle planner notices.


This documentation is built and hosted on [Mintlify](https://mintlify.com), a developer documentation platform.